Love Field Modernization Program (LFMP)
Project Name: Love Field Modernization Program (LFMP)
Project Location: Dallas, Texas
Project Description: As part of the overall capital improvement project, the LFMP required the demolition of the existing terminals along with their combined 20 gates. Terminal includes a new 20-gate T-shaped central concourse, check-in space, baggage claim areas and main lobby.
Project Location: Dallas, Texas
Project Description: As part of the overall capital improvement project, the LFMP required the demolition of the existing terminals along with their combined 20 gates. Terminal includes a new 20-gate T-shaped central concourse, check-in space, baggage claim areas and main lobby.
Project Size (Gross Square Feet) and Type:
- Terminal 913,956 Square Feet (LFMP LEED® Boundary)
- Central Plant
- Control Tower
Owner:The City of Dallas
Developer: Southwest Airlines, Dallas
Architect: Corgan Associates, Dallas
MEP Engineer: Jacobs, Dallas
General Contractor: Hensel Phelps Construction Co., Dallas
Project Duration: Begun 2011 and completion October 2018.
USGBC LEED® Certification Level: Silver
Developer: Southwest Airlines, Dallas
Architect: Corgan Associates, Dallas
MEP Engineer: Jacobs, Dallas
General Contractor: Hensel Phelps Construction Co., Dallas
Project Duration: Begun 2011 and completion October 2018.
USGBC LEED® Certification Level: Silver
Description of Project Services Provided:
Facility Performance Associates and AIR Engineering and Testing (both are Gerald Kettler Companies) were contracted and completed:
- Energy Efficiency and LEED® Consulting
- Commissioning of HVAC & R, lighting and building control systems, domestic water
- Test Adjust and Balance
- Air Quality Testing Before Occupancy
- Consultation work with design engineers and architect to provide assistance with the energy simulation model process for LEED®
- Creation of the schedules of maintenance requirements & frequency
- Creation of the schedule for re-testing commissioned systems with blank test forms from the original commissioning plan.
- Creation of the schedule for calibrating sensors & actuators.